PLAIN-LANGUAGE SUPPLY CHAIN GLOSSARY · 58 TERMS

Terminology

Supply-chain language can sound like a different dialect. Search this glossary for plain-language definitions and examples, including the planning and forecasting terms used in the 40-hour course.

How to use this page: Search for a word or scroll through the table. Examples use fictional products and numbers. Companies may use some terms differently, so check local definitions when applying them at work.

Search by term, category, explanation or example.

Showing 42 terms

On a phone, swipe the table sideways to read all columns.

TopicTermIn simple wordsExample
ForecastingDemandThe amount of a product or service customers want during a period.If customers want 120 bottles next month, demand is 120 bottles.
ForecastingDemand forecastAn estimate of future demand made from history, plans and other useful information. It is a best estimate, not a promise.A forecast of 120 bottles can be revised if a promotion or new information changes the outlook.
ForecastingDemand planA reviewed view of expected demand that teams use to prepare for the future.Sales expects 130 bottles, the forecast is 120, and the team agrees to plan for 125.
ForecastingForecast errorThe difference between what was forecast and what actually happened.Forecast was 100 units and actual demand was 110: the forecast missed by 10 units.
ForecastingForecast biasA repeated pattern of forecasting too high or too low.If forecasts are above actual demand in most months, the plan has an upward bias.
ForecastingSeasonalityA pattern that repeats at a similar time, such as each summer or holiday period.Ice-cube trays may sell more in summer each year.
ForecastingS&OP (Sales and Operations Planning)A regular meeting and process where teams align expected sales, supply, inventory and business goals.Sales shares a promotion plan; operations checks whether stock and factory time can support it.
ForecastingDemand variabilityHow much demand changes from one period to another.Sales of 95, 102 and 98 units are steadier than 60, 140 and 90.
InventorySKU (stock keeping unit)A code used to identify one specific product or product version.A blue bottle and a red bottle may have different SKUs.
InventoryInventoryGoods or materials a business keeps to sell or to use in making products.A bottle company may hold finished bottles, caps and packaging.
InventoryOn-hand stockThe quantity physically recorded at a location now. Some of it may already be reserved.The warehouse has 80 cartons, but 20 are promised to orders.
InventoryInventory positionA planning view of stock after considering usable on-hand stock, expected receipts and demand already committed. Exact rules can vary.If 80 are on hand, 30 are due in, and 25 are allocated, a simple position is 85.
InventorySafety stockExtra stock kept as a buffer against demand or supply being different from the plan.A shop keeps 15 extra chargers in case a delivery is late or sales rise.
InventoryReorder pointA stock or inventory-position level that signals it may be time to replenish.If the trigger is 50 units and the position falls to 48, the planner reviews a new order.
InventoryCycle stockThe usual stock used between replenishments, excluding extra safety buffer.A shop orders 100 units and gradually sells them before the next delivery.
InventoryService levelA target for how reliably a stock or supply policy should meet demand. The exact measure depends on the business.A team may set a target to have stock available for most customer requests.
InventoryFill rateThe share of requested units supplied immediately from available stock.If customers request 100 units and 92 ship now, the fill rate is 92%.
InventoryStockoutA situation where there is no available stock to meet a request.A customer asks for a size that is currently unavailable.
InventoryBackorderA customer order that cannot ship yet and remains open until stock is available.A customer orders 10 units; 7 ship today and 3 wait for the next receipt.
InventoryAllocationHow limited stock is assigned across customers, orders or locations.With 40 units and requests for 25 and 30, the planner decides how to split the 40.
SupplyLead timeThe elapsed time between starting a replenishment or production step and having usable supply.A supplier takes 12 days from order confirmation to delivery.
SupplyMOQ (minimum order quantity)The smallest quantity a supplier agrees to sell in one order.If the MOQ is 200, ordering 120 may not be accepted.
SupplyLot sizeThe quantity made or ordered together as one batch.A factory makes 500 labels in one print run.
SupplyPurchase order (PO)A buyer’s formal request to a supplier for specified items and delivery terms.A PO asks for 300 caps to arrive by 15 June.
SupplySupplier capacityThe maximum quantity a supplier can provide in a stated time period.A supplier can ship up to 1,000 caps per week.
ManufacturingBOM (bill of materials)A list of components and quantities needed to make one product.One kit needs one bottle, one cap and one label.
ManufacturingIndependent demandDemand that comes directly from customers or the market, rather than from another item’s production plan.Customer orders for finished bottles are independent demand.
ManufacturingDependent demandDemand for a component calculated from the plan to make its parent product.Planning 100 kits creates a need for 100 caps if each kit uses one cap.
ManufacturingMRP (material requirements planning)A calculation that works out what materials are needed and when, using demand, stock, product structure and timing.If 100 kits are due next week and there are 20 caps in stock, MRP helps identify the remaining cap need.
ManufacturingCapacityThe amount of work a person, machine, line or supplier can do in a time period.A line can pack 600 boxes in one shift.
ManufacturingCapacity constraintA limit that prevents a plan from producing or moving more in the available time.A line has time for 600 boxes but the plan needs 750.
ManufacturingBottleneckThe step with the tightest capacity that limits the output of the wider process.If packing is slower than filling, packing may limit finished output.
ManufacturingUtilizationThe share of available capacity that a plan uses.Using 7 of 8 available machine hours is 87.5% utilization.
ManufacturingProduction scheduleA timed sequence of work assigned to people, lines or machines.The schedule says which product runs first and when the line changes over.
ManufacturingThroughputThe amount of finished work moving through a process in a period.A line completes 400 good units during one shift.
CommitmentsATP (available to promise)The quantity that can be promised using supply expected to be available after existing commitments are considered.There are 50 units and 35 already promised, so a simple ATP view shows 15 remaining.
CommitmentsCTP (capable to promise)A check of whether a requested quantity and date can be met by planning or creating the needed supply and capacity.A customer asks for 200 units next week; CTP checks materials and line time before confirming.
CommitmentsPeggingA link that shows which supply is intended to cover which demand.A planned production order for 40 units is linked to a customer order for 40.
PlanningNettingSubtracting usable stock and expected supply from demand to find what is still needed.Demand is 100, stock is 20 and confirmed supply is 30: the simple remaining need is 50.
PlanningFirm orderAn order treated as committed in the plan, unlike an unconfirmed suggestion. It may still be changeable under local rules.A confirmed supplier order for 500 units is included as expected supply.
PlanningFrozen periodA near-term window where plan changes are restricted or avoided to protect execution.A factory may avoid changing tomorrow’s schedule after materials and staff are prepared.
PlanningBullwhip effectA pattern where small changes in customer demand become larger order swings farther upstream.A shop orders a little extra after a busy week; each upstream company adds its own buffer, so the factory sees a much larger jump.
ForecastingBaseline forecastA simple starting estimate made before separate event or human adjustments are added.Recent weekly sales average 43 units; 43 is the baseline before adding a confirmed event uplift.
ForecastingHoldout periodA later set of observations kept aside to check how a forecast performs on data it did not use to fit itself.Fit a method on January to September and check its forecast against October to December.
ForecastingMAE (mean absolute error)The average size of forecast misses, ignoring whether each miss was high or low.Errors of 4, 6 and 8 units give an MAE of 6 units.
ForecastingMAPE (mean absolute percentage error)The average absolute miss as a percentage of actual demand. It is not reliable when actual demand is zero or very small.A miss of 5 units on actual demand of 50 is 10%; on actual demand of 2 it is 250%.
ForecastingWAPE (weighted absolute percentage error)Total absolute forecast error divided by total actual demand for the periods being measured.Total absolute error of 20 units over 150 actual units gives WAPE of 13.3%.
ForecastingForecast value addedA check of whether a review step or adjustment improves a forecast compared with a chosen baseline.Compare the reviewed forecast with the untouched baseline on the same later periods.
SupplyNet requirementThe remaining quantity to supply after accounting for demand, desired ending stock, usable inventory and confirmed receipts.Demand 57 + target 10 − usable stock 18 − confirmed receipt 10 = 39 units.
ManufacturingBOM (bill of material)A structured list of components and quantities needed to make a parent product.One bottle needs one body, one cap and one label.
ManufacturingMRP (material requirements planning)A planning method that turns a build plan into dated component needs and supply proposals using product structures, stock and lead times.An order for 80 bottles creates dated needs for 80 caps before usable stock is subtracted.
ManufacturingRoutingThe ordered operations and resources used to make a product, often with setup and run-time standards.Assembly on Line A is followed by labeling on Line B.
ManufacturingYieldThe share of input quantity that becomes acceptable output.At 95% yield, 100 starts are expected to produce about 95 good units.
CapacityFinite capacityA plan that assigns work only up to the available time or quantity of a resource in each period.A 300-minute line cannot accept 330 minutes of planned work in the same shift.
CapacityBottleneckThe resource that currently limits the flow or output for a particular plan.If 72 kits are available but the line can make 76, kits limit the build to 72.
SchedulingCritical ratioTime remaining until an order is due divided by the processing time still needed; a lower value can signal greater urgency.Six hours remain and two hours of work are needed: the ratio is 3.
SchedulingSchedule adherenceA measure of how closely actual starts, quantities or completions match an agreed schedule, using a stated rule.A team may compare completed quantity by the planned date with the scheduled quantity.
SchedulingChangeoverThe work needed to switch a resource from one product, format or process setting to another.Changing the line from one bottle color to another may require cleaning and label setup.

These short definitions are for learning. They simplify concepts and do not replace the detailed rules, formulas or process definitions used by a particular company or planning system.