How to Use Substitute Stock Without Stealing From Other Customers
Using a better or larger item (Item B) as a substitute when Item A runs out is helpful—unless you forget to lock away the Item B stock already promised to Item B customers.
Interactive calculator loads automatically in modern browsers. All plain-English explanations, units, and tables are shown directly on this page.
How This Rule Works in Simple Steps
What We Want to Achieve: honor B protection — Substitution consumes stock needed by another committed product.
- Substitute floor((B-reserve)/B-per-A) subject to A shortage.
- Substitution consumes B at the declared integer conversion.
- A reserve greater than available B permits no substitution.
- Keep pure calculation code separate from storage and UI.
Three Simple Steps We Compare on This Page
- 1. Normal Day (Baseline Plan): Apply the baseline policy to the frozen input state.
- 2. Problem Day (When Something Goes Wrong): Use substitute B without reserving B for its own demand.
- 3. Fixed Plan (How We Solve It): Protect the declared B allocation before substituting for A.
Important Things to Remember Before Using in Real Life
- Technical substitution is preapproved in this fictional case.
- Passing this model does not validate a complete real supply chain.
- A case must disclose every assumption used in the calculation.
7 Worked Examples of "How to Use Substitute Stock Without Stealing From Other Customers"
Click any of the 7 worked examples below to open its own separate page with step-by-step numbers and a visual bar chart:
- SCI-029: The substitute stole a promise — B stock can replace A at a two-to-one ratio. (Protecting B changes which customer promise receives the shortage.)
- SCI-030: Universal part not free stock — One common part can serve several repairs. (Technical interchangeability does not remove allocation commitments.)
- SCI-031: Promotion consumes service stock — A promotion can consume repair inventory. (Higher immediate volume may shift shortage to a protected use.)
- SCI-032: One size conversion — Two small sleeves can fulfill one approved large use. (Substitution can consume twice the count suggested by the shortage.)
- SCI-033: Fallback color allocation — A substitute color is approved only in this case. (The fallback option still draws down stock promised elsewhere.)
- SCI-034: Shared repair pool — A repair pool supplies two replacement categories. (A locally improved metric can create a later service deficit.)
- SCI-035: Emergency material reservation — One material has an emergency reserve. (The reserve rule limits otherwise feasible substitution.)