When Two Suppliers Share One Bottleneck Port or Backup Shop
Having two different suppliers looks safe on paper—until you discover both of them ship through the exact same port or rely on the same small emergency workshop.
Interactive calculator loads automatically in modern browsers. All plain-English explanations, units, and tables are shown directly on this page.
How This Rule Works in Simple Steps
What We Want to Achieve: maximize on-time complete kits — Two primary sources depend on one failed resource.
- Maximize k with max(0,k-A)+max(0,k-B) <= backup capacity.
- Backup A plus backup B never exceeds shared capacity.
- Zero backup capacity leaves only usable primary and buffer stock.
- Keep pure calculation code separate from storage and UI.
Three Simple Steps We Compare on This Page
- 1. Normal Day (Baseline Plan): Apply the baseline policy to the frozen input state.
- 2. Problem Day (When Something Goes Wrong): Remove both primary receipts from the on-time window.
- 3. Fixed Plan (How We Solve It): Preposition the specified A and B buffers before the event.
Important Things to Remember Before Using in Real Life
- One A and one B per kit; equal backup unit times.
- Passing this model does not validate a complete real supply chain.
- A case must disclose every assumption used in the calculation.
7 Worked Examples of "When Two Suppliers Share One Bottleneck Port or Backup Shop"
Click any of the 7 worked examples below to open its own separate page with step-by-step numbers and a visual bar chart:
- SCI-001: Two sources one port — Both sources enter through one port. (A port closure removes both primary receipts from Friday availability.)
- SCI-002: Two plants one substation — Both plants use one substation. (A power loss affects both nominally separate production locations.)
- SCI-003: Two carriers one subcontractor — Two carriers share one linehaul operator. (A subcontractor stoppage makes both carrier promises unavailable.)
- SCI-004: Two sources one inspection bench — Both incoming parts need one inspection bench. (A bench outage blocks both receipts even though transport arrives.)
- SCI-005: Two sites one mold — Both backup sites depend on the same transferable mold. (The tool cannot be used simultaneously at two backup locations.)
- SCI-006: Two warehouses one bridge — Both replenishment routes cross one bridge. (A bridge closure removes both planned delivery paths.)
- SCI-007: Two materials one finishing partner — Both suppliers outsource final finishing. (A finishing stoppage blocks both nominally available sources.)