How Much Extra Raw Material to Start With When Some Output Fails Quality Check
If a customer orders 90 good items and your machine only produces 80% good items under stress, starting with 100 pieces gives only 80 good units—you must start with 113 pieces.
Interactive calculator loads automatically in modern browsers. All plain-English explanations, units, and tables are shown directly on this page.
How This Rule Works in Simple Steps
What We Want to Achieve: meet good-output demand — A lower yield creates output shortage from unchanged input.
- Good output = floor(input * yield / 100).
- Yield is greater than zero and at most one hundred percent.
- The output floor must occur before the demand comparison.
- Keep pure calculation code separate from storage and UI.
Three Simple Steps We Compare on This Page
- 1. Normal Day (Baseline Plan): Apply the baseline policy to the frozen input state.
- 2. Problem Day (When Something Goes Wrong): Apply the lower validated scenario yield to planned input.
- 3. Fixed Plan (How We Solve It): Stage enough input before processing at the same lower yield.
Important Things to Remember Before Using in Real Life
- Extra input assumes material and processing capacity are feasible.
- Passing this model does not validate a complete real supply chain.
- A case must disclose every assumption used in the calculation.
7 Worked Examples of "How Much Extra Raw Material to Start With When Some Output Fails Quality Check"
Click any of the 7 worked examples below to open its own separate page with step-by-step numbers and a visual bar chart:
- SCI-085: Input is not good output — A lower process yield reduces shippable units. (The same input produces fewer complete units at lower yield.)
- SCI-086: New material trial yield — An approved trial has a different yield assumption. (Material availability alone cannot guarantee the needed good output.)
- SCI-087: Inspection acceptance yield — Final acceptance determines usable output. (Rejected units do not count as shippable inventory.)
- SCI-088: Rework loop consumes input — The toy summarizes recovery as an effective yield. (A yield repair needs its input and capacity assumptions reviewed.)
- SCI-089: Batch start losses — Start-up losses reduce accepted output from a batch. (The fixture uses proportional yield and labels that simplification.)
- SCI-090: Rounding at the wrong stage — Fractional good units are not shippable. (A fractional intermediate cannot satisfy a whole customer unit.)
- SCI-091: Extra input needs capacity — More input is only useful if processing can handle it. (The calculation shows material need while feasibility remains explicit.)