COURSE OVERVIEW · 499-HOUR LEARNING PATH

Supply Chain Forecasting Course

Learn how a demand signal becomes a supply plan, how real limits change that plan, and how teams turn it into a production schedule.

Start with everyday examplesInteractive overview: about 35 minutes50 lessons with 8-hour activity plansProgress saves in this browserExplore the full 499-hour study plan →
THE PLANNING PATH01 → 05
Five steps from demand signal to production scheduleDemand planning flows into supply planning, constraint planning, manufacturing planning, and production scheduling.01DEMAND02SUPPLY03CONSTRAINTS04MANUFACTURING05SCHEDULEOne shared plan, updated as new facts arrive
Your course progress: 0 of 5 lessonsMark lessons complete as you go. Progress stays in this browser.Learning points: 0 · Badges: earn one by learning · No cash value
END-TO-END CAPSTONE · PUT THE PLAN TOGETHER

A shortage before the Friday shipment

Use one realistic scenario to connect the forecast, inventory, supplier limit, line capacity and customer promise. Pick a response to reveal the trade-offs.

DEMAND TO COVER120 forecast + 8 backlog128 bottles in total
AVAILABLE SUPPLY28 stock + 20 receipts48 already cover demand
NET BUILD NEED80 bottles128 − 48 = 80
Main supplier72 kits
→
Normal line76 units
→
Dispatch cap82 units
Supplier is the first constraint

What would you do?

Assumptions: alternate kits cost ₹35 each above base, overtime costs ₹90 per extra unit, and dispatch can handle 82 units. These are made-up teaching figures, not market prices. Whether the premium is worthwhile depends on the cost of a missed order and available policy.
Learning exercise: the quantities are illustrative. A real plan also depends on product rules, calendars, data quality, supplier agreements and local operating constraints.
ANIMATED SUPPLY-CHAIN ADVENTURE · AGES 10 TO 100

Supply Plan Sprint: Toy Factory Express

Watch your Supplier, Toy Factory, Smart Warehouse, and Delivery Trucks come alive! Balance happy kids, safety stock, and coins across 5 action-packed weeks.

60FPS ANIMATED · 5 WEEKS
Kid-Safe Educational Game · 100% private in-browser play with fictional toys and coins. No personal data or email required. Click any building or truck on the animated map to inspect it!
INSTANT PLAY ACCESS

Play the animated adventure or sign in for ranked play.

Play the 5-week animated Toy Factory Express game right away—or sign in if account services are enabled.

QUANTITATIVE FINANCE + SUPPLY-CHAIN SCIENCE

FBS — Scientific Financial & Inventory Forecaster

An econometric and working-capital decision laboratory that couples a supply-chain inventory forecast with a 5-year historical balance sheet using State-Space Damped Holt, Theil-Sen robust regression, and Monte Carlo P10–P90 uncertainty bands.

SCIENTIFIC ENGINE v2.0
100% Private In-Browser Computation. PDFs are parsed locally on your device and are never uploaded to any server. Or test immediately with a 1-Click Verified Benchmark Dataset below. Educational & analytical decision support only—not statutory accounting, tax, or investment advice.
COUPLED WORKING-CAPITAL & STATE-SPACE MODELING

Why inventory plans and financial statements must be solved together.

Conventional forecasts project inventory in isolation from trade payables, working-capital cash absorption, and holding-cost drag. FBS v2.0 reframes the problem scientifically: it backtests three time-series estimators out-of-sample on your 5-year history, couples next-year inventory shifts to supplier payables (DPO/DIO elasticity) and carrying costs (WACC + storage + obsolescence), and quantifies P10–P90 confidence bands.

Precision-Weighted Ensemble

Blends Damped Holt State-Space trend, Theil-Sen non-parametric slope, and historical drift weighted by walk-forward out-of-sample RMSE.

Working-Capital & Carrying-Cost Coupling

Quantifies how inventory buffers or lean releases alter Net Working Capital (ΔNWC), supplier payables financing, and retained earnings.

Probabilistic P10–P90 Bands & Ratios

Outputs 80% confidence intervals, Current/Quick/Debt-to-Equity ratios, and a 6-year visual trajectory fan chart.

01Load Data or 6 PDFsUpload 5 balance sheets + 1 inventory PDF, or load a 1-click benchmark
02Verify & Tune LeversAudit the 5-year accounting identity and set WACC / DPO coupling
03Analyze Ensemble & Fan ChartInspect P10–P90 projections, backtest WAPE, and NWC cash impact
STEP 1 · LOCAL PDF EXTRACTION OR INSTANT BENCHMARK DATASET

Choose source reports or load a verified benchmark company

Upload five annual balance-sheet PDFs (oldest to newest) plus one inventory forecast PDF—or click a benchmark company below to test the scientific forecasting suite immediately.

⚡ 1-Click Scientist Benchmarks:

Upload five annual statements, one PDF for each year.

pdf only · five files · maximum 10 MB each No files selected

Choose a report with a projected inventory line.

pdf only · one file · maximum 10 MB No file selected
Use the same unit for all uploaded reports and values.
Select all six PDFs—or load a 1-click Scientist Benchmark Dataset above.
What happens to my PDFs?

The PDFs and extracted text stay in your browser session. The tool does not send them to a server or save them to an account. Closing or refreshing the tab clears the selected files and extracted values. Avoid uploading confidential records to any website unless you have permission.

COUPLED OPERATIONS & FINANCE ARCHITECTURE

From supply-chain inventory posture to balance-sheet resilience.

Rather than treating balance-sheet lines as isolated random walks, FBS v2.0 links operational inventory decisions directly to working-capital financing (Trade Payables DPO/DIO elasticity), holding-cost drag (WACC + warehousing + obsolescence), and out-of-sample backtested time-series ensembles.

Coupled supply-chain and financial forecasting architecture 5-year statements and inventory plans feed the walk-forward ensemble and working-capital coupling engine to produce P10 to P90 balance-sheet projections. 1. 5-Yr History + Plan Local PDFs or Benchmarks Identity Audited 2. Ensemble + Coupling Damped Holt · Theil-Sen DPO/DIO & WACC Linked 3. P10–P90 Output Fan Chart · NWC Bridge Backtest WAPE Scored
01 / PRACTICE LIBRARY

Supply Chain Articles

100 original short reads on practical supply chain ideas, AI and operations.

100 ARTICLES
IN-DEPTH FIELD GUIDES · SOURCE-LINKED

Go beyond the quick read.

Longer practical guides expand ideas from the library and separate source findings from practitioner commentary.

Browse all field guides →
04 / TECHNICAL LIBRARY

Supply Chain Forecasting · Advanced

50 technical reads on probabilistic forecasting, machine learning and forecast value.

50 ARTICLES
EDUCATIONAL SIMULATOR · CONTROL TOWER

Six weeks. One living supply chain.

Make a plan with incomplete information, then see how lead times, capacity, variability and disruptions change the result.

Learning simulation · All costs, demand and events are illustrative. This is not a forecast or operational planning tool.
Play without an account, or sign in to save your decisions and resume later.
WEEK1 / 6Planning horizon
ON-HAND90 unitsAfter this week's receipts
FILL RATE100%Cumulative demand filled
BACKORDERS0 unitsUnfilled customer demand
TOTAL COST$0Production, holding, delay and shortage
WEEKLY DECISION

Week 1 · Check the signal

WEEK 01
↗
DISRUPTION / MARKET SIGNAL

Demand outlook

Event notes appear here.

FORECAST100units
SUPPLIER RECEIPTS DUE0 units
FACTORY CAPACITY THIS WEEK100 units
PIPELINE0 units

Arrives next week · $4/unit · capacity constrained

80 units
0 units100 units

Available now · $11/unit · limited emergency capacity

0 units
0 units40 units
💡

Planner's note: Base production is cheaper but has a one-week lead time. Expedite can protect service today, but costs more and has a 40-unit cap.

Material flow this week

Opening stock90+Supplier receipts0+Expedite0−Demand served0=Closing stock90

Backorders are tracked separately and carried into the next round.

FORECASTING PLAYGROUND

Change the demand shape.

Adjust trend, seasonal swing and noise. See how a simple baseline compares with a small AI-style model on held-out weeks.

Read the calculator guides →
Illustrative only · The “AI-style” forecast is a local regression model with a trend and seasonal terms. It is not an LLM, does not upload data, and is not a production forecast.

Demand scenario

32 simulated periods · 24 train · 8 holdout · no external data

Forecast vs. observed

ActualSimple moving averageAI-style trend + season model
PLANNING CALCULATORS

Turn the signal into a simple plan.

Try the numbers in your browser. These tools use transparent starter formulas, not a full planning system.

01 · FORECAST REVIEW

Score a forecast

Compare actual and forecast demand, in matching time periods and units.

Enter matching values, then calculate.MAE is in units; WAPE shows total absolute error relative to total actual demand; signed bias is forecast minus actual. WAPE is undefined when total actual demand is zero.
02 · INVENTORY POSITION

Reorder point & suggested order

A basic continuous-review example: expected lead-time demand plus a chosen buffer.

ROP 78 units · inventory position 52 · suggested order 26.Reorder point = average demand × lead time + buffer. Suggested order restores inventory position to that point; lot sizes and calendars are not modeled.
03 · FINITE CAPACITY

Check a line load

Estimate required run and setup minutes against the time actually available.

Load 328 / 360 min · 91.1% · about 8 units of capacity remain.Includes one setup allowance and one item rate. Real schedules may need multiple routings, shifts, labor rules, downtime and sequence-dependent setup.

Educational only. Validate formulas, units, policy settings and service targets with your planning team before using them for operational decisions.

SIMPLE BASELINE · WHERE IT FAILS

Good yardstick, slow to turn.

A moving average is transparent and hard to overfit. It can lag after a trend shift, flatten peaks, and miss recurring seasonal peaks.

AI-STYLE MODEL · WHERE IT FAILS

Can fit a pattern that vanished.

A trend plus seasonal model can be wrong after a regime change, with short or biased history, or when promotions and supply constraints reshape observed sales.

Model names are descriptive of this demonstration. Compare on rolling, time-ordered holdouts before selecting any method for real planning.

Akshay Kaushal, founder of Supply Chain Ideas
Founder, supplychainideas.com

Contact Founder

LinkedIn
PRIVACY & EDUCATIONAL USE

Clear about data. Clear about limits.

Last updated 29 October 2026.

Contact

The Contact CEO page links to Akshay Kaushal’s public LinkedIn profile. This static website does not collect messages or contact form submissions.

Account and simulator data

If account features are configured, Supabase handles passwords, email verification, and password resets; this static website does not store plaintext passwords. Saved simulator progress is protected by row-level security so a signed-in user can access only their own saved record. The site does not ask for sensitive business data. Other site features may continue to use email sign-in.

Local browser data

The reading list and simulator best score remain in your current browser using local storage. Clearing browser storage removes them. If cloud saving is unavailable, the screen displays a save error; do not assume the latest changes were retained. FBS PDF files and extracted figures are processed in the browser and are not uploaded or retained by this static site.

Third-party services

Bootstrap, the PDF.js reader and the Supabase client are bundled locally at pinned versions. PDF JavaScript and XFA are disabled while reading files. System fonts are used so text renders without a third-party font request. No analytics or advertising trackers are included in this static package. When enabled, authentication and simulator saves use the site owner’s Supabase project. External research and LinkedIn links open pages operated by those providers, whose own privacy terms apply.

Educational use

The simulator, forecasting playground and articles are educational. Their scenarios and results are illustrative and are not operational, financial or professional advice. Validate methods against your data, constraints and approved planning process.